Customization: | Available |
---|---|
After-sales Service: | Provided |
Warranty: | One Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product description
The main modules of this system are electric dynamometer, variable frequency inverter system, measurement and control system, data acquisition system and so on. At the same time, according to different test objects and different test requirements, it will also be equipped with power analyzer, battery simulator, chiller, tested equipment support system, cast iron plate and shock absorbers, protective cover and other parts.
SSCG30-3000/10000 electric dynamometer technical parameters
Item | Electric dynamometer parameters |
Model | SSCG30-3000/10000 |
Brand | Seelong |
Rated Power (kW) | 30 |
Rated Torque (Nm) | 95 |
Constant Torque Speed Range (rpm) | 0-3000 |
Constant Power Speed Range (rpm) | 3000-10000 |
Max Working Speed (rpm) | 10000 |
Over-speed capacity | 120% |
Rated voltage (V) | AC 380 |
Rated current (A) | 61 |
Heat-dissipating method | Forced cooling |
Torque Measurement Accuracy (%FS) |
±0.2%FS |
Encoder | Shanghai Jingfen |
Model of encoder | HTL 512 |
Can be customized |
SSCG30-3000/10000 electric dynamometers have the following advantages:
Integrated design: Integrated architecture innovative design scheme, simplified operating station.
Quick clamping: Simple and efficient clamping scheme is adopted to facilitate the operation of production line staff and meet the production line production rhythm.
Quick test: Through the system preset test items, can improve the efficiency of production test.
Convenient operation: professional testing software, user-friendly operation interface.
Software features: graphical interface (Win7 operating environment), open architecture software platform.
Data management: test project editing function, test report export function, test data analysis function, user permission setting function, support bar code entry function.
Strong scalability: support function customization.
Dynamometer selection
1.Output power formula: P2= N *T/ 9.55N: speed (r/min)T: torque (N.m)
2.Efficiency formula: η=P2/P1*P2: output power (W)P1: input power (W)
3.Efficiency experience value: series motor: < 65% hood pole motor: < 30%
4.Estimated induction motor torque: Tmax=(P2*9.55)/(NO *0.9)*2 times NO: no-load speed
5.Estimated series motor torque: Tmax=(P1*η*9.55)/(NO *0.6)*2 times NO: no-load speed
6.Estimate dc motor torque: Tmax=(U*I*η*9.55)/(NO *0.5)*2 times I: rated current
Company profile
Seelong Intelligent Technology (Luoyang) Co., Ltd. is a high-tech enterprise specializing in equipment measurement, control, design, manufacturing, and sales services for power engineering systems in various fields such as aerospace, automotive, and new energy; The company is located in the beautiful peony city of Luoyang.
Seelong specializes in the research and development, production, and service of testing equipment for new energy motors, hybrid power systems, engines, transmissions, and more. The main products include electric dynamometer, measurement and control system, DC power supply, and condition guarantee system. Seelong has a complete sales and service system, adhering to the business philosophy of quality survival and service development, providing users with various types of power engineering measurement and control solutions in various fields.
All employees of Seelong Intelligent Technology (Luoyang) Co., Ltd. warmly welcome sincere cooperation from domestic and foreign customers, and work together for the future and common development.
Company Certificates
Packaging and Shipping
FAQ
Q: What's the minimum order quantity for our cooperation?
A: We support small trail order of 1 pcs for stock products.
Q:How can I learn more about the products?
A: Please leave your email and we will send you our electronic sample book.
Q: What's your payment term?
A: Normally 40% T/T deposit, pay in full before shipment.
Q:What's the lead time for my orders?
A: Dynamometers production cycle is 6-8 working weeks, sensors production cycle is 2-3 working weeks, other products please contact with us.
Q: How do we get the overall solution of the test bench?
A: Leave us your email, our technical staff will communicate with you about the detailed plan.
Q: Can I come to visit your factory?
A: Sure, you are always welcomed to have a visit.